Construction during rainy weather is often unavoidable and poses additional challenges to rotary drilling rig operations. Wet surfaces and increased soil moisture can impact construction safety, equipment operation, and project quality. Therefore, scientific methods and proactive measures are essential to ensure smooth operations during rainy weather. Here are the primary techniques and precautions for rotary drilling rig operation in such conditions:
Equipment Inspection
Before starting operations, conduct a thorough inspection of the drilling rig, including the hydraulic system, transmission components, electrical circuits, and waterproof parts. Pay special attention to the hydraulic system to prevent potential leaks that could worsen under wet conditions.
Drainage Setup
Rainy weather can lead to water accumulation at the construction site. Implement drainage systems or dig drainage channels in advance to prevent muddy conditions from affecting the equipment.
Emergency Plans
Prepare contingency plans based on weather forecasts, including work stoppage strategies and safety evacuation procedures, to minimize potential losses from sudden weather changes.
Reduce Drilling Speed
Soil moisture increases in rainy conditions, leading to higher drilling resistance due to thicker mud. Reducing the drilling speed can decrease equipment load and improve borehole stability.
Control Drilling Pressure
Wet and slippery conditions increase the risk of rig movement or tilting. Strictly control the drilling pressure to ensure stable operation and avoid excessive stress on the drill rod, which could lead to bending or breakage.
Ensure Borehole Cleaning
Rainy conditions generate more mud, which can block the borehole or drilling tools. Regularly clean the borehole to remove mud buildup, improving both efficiency and borehole quality.
Strengthen Rig Stability
Slippery ground can reduce equipment stability. Use steel plates or anti-slip mats to secure the rig’s legs, ensuring stability and preventing tipping accidents.
Clean Residual Materials
After operations, the drilling rig and tools may be covered with mud and wet soil. Clean the equipment promptly to prevent solidified mud from affecting performance.
Inspect Key Components
Focus on inspecting the hydraulic system and electrical components post-construction to ensure no damage or malfunction due to humidity. Lubricate the equipment to prevent rust on metal parts.
Proper Equipment Storage
If rainy weather persists or the project is temporarily halted, store the rig in a dry and ventilated location, and cover it with a rainproof tarp to prevent moisture damage.
Prevent Electrical Accidents
Rain increases the risk of electrical hazards. Ensure cables and electrical components are waterproof and assign personnel to check electrical safety regularly.
Halt Operations Promptly
Stop operations during heavy rain or thunderstorms to ensure the safety of both personnel and equipment.
Wear Protective Gear
Operators should wear non-slip shoes, waterproof gloves, and other protective equipment to reduce risks in slippery conditions.
Operating rotary drilling rigs in rainy weather demands higher operational skills and meticulous equipment maintenance. By making proper preparations, adhering to standard procedures during operations, performing thorough post-operation care, and strictly following safety protocols, the risks associated with rainy weather can be effectively minimized, ensuring smooth project progress.