Views: 0 Author: Site Editor Publish Time: 2025-04-03 Origin: Site
Rotary drilling rig as the construction of the effective "master", after a long time of high-intensity operation, it is very easy to wear. If it is not properly maintained, it will not only reduce the performance of the equipment, shorten the service life, but also cause safety accidents during construction. Do a good job of daily maintenance of rotary drilling rig is very important, the following is to introduce the three elements of daily maintenance of rotary drilling rig.
1. Component cleaning: After each operation, clean the soil, sand and other debris on the drill pipe and drill surface in time to prevent it from entering the equipment and causing wear. At the same time, it is also necessary to wipe all parts of the fuselage to keep the equipment clean and reduce the incidence of failure.
2. Lubrication maintenance: According to the equipment manual, regularly lubricate each lubrication point, such as slewing support and walking mechanism. The use of appropriate lubricants can reduce friction between components and extend the service life of equipment components.
3. Fastening check: Regularly check whether the bolts and nuts of each connection part are loose, especially the key parts such as the working device and the chassis. Once it is loose, tighten it immediately to avoid safety accidents caused by parts falling off.
4. Oil management: Check the liquid level and quality of hydraulic oil, oil and fuel regularly, add in time when the liquid level is insufficient, and replace the oil as soon as possible. Maintaining the normal operation of the oil system is the basis for the stable operation of the equipment.
5. Electrical testing: Check the lines, connectors, sensors, etc. of the electrical system to see if there are problems such as aging, damage, and poor contact. Discover potential faults and repair them in time to prevent electrical faults from affecting equipment operation.
6. Replacement of wearing parts: Pay attention to the wear of wearing parts such as drill, wire rope, filter, etc. When the service life is reached or the wear is serious, replace it in time to ensure the stable performance of the equipment.
Doing a good job of daily maintenance of rotary drilling RIGS can keep the equipment in good condition at all times, extend the service life of the equipment, reduce construction costs, and greatly improve construction safety. Every equipment manager and operator should pay attention to daily maintenance so that the rotary drilling rig can better serve the construction.