During the construction of rotary drilling rig, if the track suddenly breaks, it will not only cause the rig can not move normally, but also affect the drilling operation due to imbalance, and even endanger the safety of the construction personnel. Therefore, it is necessary to master the method of coping with track breakage.
1. Immediate shutdown: After the operator finds that the track is broken, it should press the emergency shutdown button at the first time to stop all the actions of the rig to avoid more serious mechanical damage or safety accidents caused by continued operation.
2. Assess the site situation: quickly check the surrounding environment to determine whether the broken track poses a threat to the surrounding equipment and personnel. At the same time, check the degree of fracture of the track, whether it is partially damaged or completely disconnected, to provide a basis for subsequent maintenance.
3. Set warning signs: Place warning cones and warning lights in appropriate positions around the rig to prevent other construction vehicles or personnel from entering by mistake and ensure the safety of site operations.
4. Prepare maintenance tools and accessories: Prepare accessories, such as connecting pins and track plates, and maintenance tools, such as wrenches and jacks, based on the track model.
5. Disassembly and replacement: jack and other tools will be used to lift the rig, so that the broken track part suspended, carefully disassemble the damaged track plate and related parts, and then install a new track plate, connect the track.
6. Commissioning and inspection: After the replacement is completed, start the rig, move slowly, check whether the track runs smoothly, whether the connection parts are firm, and confirm that there is no abnormality before continuing to put into construction.
Conclusion: When the track of rotary drilling rig breaks, timely shutdown, comprehensive evaluation and standard maintenance are the key to solve the problem. Equipment inspection and maintenance before construction can reduce the risk of track breakage and ensure smooth construction.