You are here: Home » News » Article » A Method To Improve The Construction Efficiency of Rotary Drilling Rig

A Method To Improve The Construction Efficiency of Rotary Drilling Rig

Views: 0     Author: Site Editor     Publish Time: 2025-04-16      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

In the construction, rotary drilling rig plays a key role. Its construction efficiency directly affects the progress and cost of the project. Next, we will introduce six methods to effectively improve the construction efficiency of rotary drilling RIGS.

1


1. Reasonable selection of rig type: According to engineering geological conditions and requirements of pile diameter and pile depth, select a rig suitable for power, torque and lifting capacity, so that the performance of the rig can meet the construction needs.


2. Prepare the construction site: smooth the site in advance to ensure the stable parking of the rig; Remove underground obstacles to prevent drilling obstruction and save construction time.


3. Optimize drilling process: According to different formation characteristics, flexibly adjust drilling parameters, such as speed, bit weight, etc., to ensure efficient drilling and reduce drilling time.


4. Timely cleaning of drilling slag: equipped with efficient slag removal equipment to remove drilling slag in the hole in time to avoid repeated crushing and maintain a good drilling environment.


5. Ensure mud performance: modulating mud with excellent performance, stabilizing hole wall, suspending drilling slag, making the drilling process smoother, reducing hole collapse and other failures.


6. Strengthen equipment maintenance: regularly check the parts of the rig, timely replace the wear parts, ensure the normal operation of the equipment, reduce the failure and shutdown rate.


In summary, through reasonable selection, careful preparation of the site, optimization of the process, timely slag removal, ensuring mud performance and strengthening equipment maintenance and other measures, it can significantly improve the construction efficiency of rotary drilling rig and help the efficient promotion of the project.


Anhui Yingxie Foundation Engineering Co., Ltd. is a leading exporter of construction machinery in China.

QUICK LINKS

PRODUCT CATEGORY

CONTACT US

 +86-15558187303
 +8615558187303
 1072987052
 1217, Building 3, next to Ji Vienna Hotel, Sanba Street, Yongqiao District, Suzhou City, Anhui Province
Leave a Message
CONTACT US
Copyright  2024 Anhui Yingxie Foundation Engineering Co., Ltd. All Rights Reserved. | Sitemap | Privacy Policy