Rotary Excavation Construction Problems And Countermeasures for Deep And Large Piles 2024-11-22
Problems and countermeasures of deep pile construction 1, construction efficiency is low, the main reason is to lift down the drilling tool takes up too much time, the efficiency of the drill pipe to transfer the drilling pressure is low.Countermeasures: (1) raise the length of the drill bit, so tha
Read More