Views: 0 Author: Site Editor Publish Time: 2025-03-27 Origin: Site
Small rotary drilling rig plays an important role in all kinds of engineering construction, and its cab is like the "central nerve" of operation. Proper use and maintenance of the cab is very important to ensure the safety of operation and improve work efficiency. Next, we will introduce the use and maintenance points of the small rotary drilling rig cab in detail.
1. Pre-operation inspection: Before starting the rig, it is necessary to carefully check whether all kinds of instruments and control buttons in the cab are in normal condition. Make sure that the display is clear and there is no fault alarm to avoid the device working with "disease".
2. Control specifications: During operation, each handle and pedal should be controlled smoothly. Avoid sudden pulling or stomping to avoid damage to equipment components and ensure the accuracy of drilling operations.
3. Cleaning work: clean the dust and debris in the cab regularly to keep the environment clean. Pay special attention to the cleaning of the control panel and display screen to prevent dust accumulation from affecting the sight and operation.
4. Temperature control: reasonable use of air conditioning system to adjust the cab temperature. Avoid overheating in summer and too cold in winter to create a comfortable working environment for operators and improve work concentration.
5. Seat adjustment: Adjust the seat according to the height and body type of the operator. Ensure that the height and Angle of the seat are appropriate, which can reduce fatigue and facilitate the operation of various equipment.
6. Circuit maintenance: Check the circuit connection in the cab regularly. Check whether the line is damaged or aging to prevent failure or even fire caused by circuit problems.
In short, the correct use and careful maintenance of the cab of the small rotary drilling rig can extend the service life of the equipment, ensure the safety and comfort of the operator, and better promote the smooth progress of the project construction.